72h forecast with MM5 V3.7, nested run using - mm5_60 run as input - 15km x 15km resolution - 77 x 73 Grids - Noah land-surface scheme - MRF PBL - Grell cumulus scheme - Graupel (Reisner2) explicit moisture scheme - Cloud for atmospheric radiation Grid description: DDOM: xfirst: 2.800095 yfirst: 42.172424 xsize: 76.0 ysize: 72.0 xinc: 0.02 yinc: 0.14 xnpole: 0.0 ynpole: 0.0
- operational model of MeteoSwiss - configuration: Leap frog time integration; Tiedtke convection scheme with moisture convergence closure; two layer soil module (likely to be changed during DOP); prognostic TKE, qr and qs; no graupel scheme - forecast range 72h starting at 00UTC and 12UTC. Missing time steps are filled with dummy text files. Grid description: DDOM: xfirst: -6.1875 yfirst: -14.625 xsize: 201.0 ysize: 121.0 xinc:0.0625 yinc: 0.0625 xnpole: -170.0 ynpole: 32.5
The forecasting chain is based on the 00 UTC, GFS forecasts at 0.5 degree resolution. The chain comprises the hydrostatic model BOLAM, which is driven directly by the global model, and the non-hydrostatic model MOLOCH (horizontal resolution 0.02 degrees), which is nested in cascade using a 1-way nesting procedure. BOLAM run starts at 00 UTC, MOLOCH is nested at 09 UTC. MOLOCH domain is smaller than official DPHASE domain. A 39-h MOLOCH forecast is provided daily. Only a sub-set of TIGGE list is provided (see DS). More information available here: http://www.isac.cnr.it/~dinamica/ Grid description: lat-lon Arakawa C grid. Rotated equidistant grid. DDOM: xfirst: -2.69 yfirst: -1.84 xsize: 340.0 ysize: 290.0 xinc: 0.02 yinc: 0.02 xnpole: -171.0 ynpole: 44.7
COSMO-ME is the high-resolution operational implementation of COSMO Model at the National Meteorological Service of Italy. The model domain covers most of continental Europe and the entire Mediterranean Basin. The horizontal resolution is 7km (0.0625deg) with 40 vertical levels. The model is routinely run on the ECMWF super-computer once a day at 00Z with hourly output. The initial conditions are interpolated from the Italian Met. Service 3DVAR-FGAT data assimilation system. The boundary conditions (BC) are provided by IFS global model. Grid description: DDOM: xfirst: -5.875 yfirst: -14.312 xsize: 194.0 ysize: 112.0 xinc: 0.0625 yinc: 0.0625 xnpole: -170.0 ynpole: 32.5
ALADIN is the operational model at Meteo-France. The horizontal resolution is 9.5km, the time step : 415s with a Semi-lagrangian scheme. There are 46 vertical levels with 15 levels below 3000m. The domain of the integration is : (-11.84W, 33.14E) (25N,56.95N) Physical parameterization: - the micro-physics scheme use 4 prognostic variables: liquid and ice cloud water, rain and snow. - the convection scheme is based on Bougeault (1985) with a donwdraft parameterization. - the operational ECMWF radiation code which is called every 60 minutes. - the burbulence is based on Louis's function with an interactive mixing length. ALADIN is coupled with ARPEGE every 3 hours and has its own assimilation system based on 3DVAR. The post-processing in GRIB files is done on a regular LAT-LON Grid with a 0.1 deg resolution on the DPHASE domain. ALADIN-FRANCE daily performs 54h forecasts starting at 0TU, 6TU, 12TU, 18TU (only the 0UTC forecast until 30h is sent) Grid description: DDOM: xfirst: 2.0 yfirst: 43.0 xsize: 161.0 ysize: 71.0 xinc: 0.1 yinc: 0.1 xnpole: 0.0 ynpole: 0.0
not filled
The Canadian Meterological Centre (CMC) is running the Global Environmental Multiscale (GEM) model in limited-area mode for the duration of the MAP D-PHASE project (1 June - 31 November 2007). The model is run once-daily directly from operational GEM meso-global forecast data (grid spacing of 33 km). A pair of domains are used for the project with horizontal grid spacings of 15 km and 2.5 km. This outer (low resolution or driving) grid is initialized daily at 0000 UTC and covers all of Europe, out to the British Isles, the North Sea, and Nortern Africa. The timestep for this forecast is 300 sec and outputs are available hourly. No regional analysis or data assimilation cycle is undertaken during this project. All observational data will therefore be ingested only indrectly in the regional setup through the outer grid initialization and hourly boundary updates from the meso-global model. The GEM model is a semi-implicit, semi-Lagrangian, two time-level, non-hydrostatic model that runs in a wide variety of configurations. An updated version (v3.3.0) of the GEM model is being used for the MAP D-PHASE project in preparation for the Vancouver 2010 Olympic Games project. This version takes advantage of recent developments designed to enhance the quality of guidance over regions of steeply-sloping orography, including the addition of a 6-category bulk microphysics scheme and time-varying orography over the initialization period. For more information on -the GEM model dynamics: see Cote et al (1998) [Mon. Wea. Rev.]. -the model physics package: contact Recherche en Prevision Numerique for the related technical document by Mailhot. -the model's microphysics scheme: see Milbrandt and Yau (2007) [Mon. Wea. Rev.]. Grid description: DDOM: xfirst: 2.0 yfirst: 43.0 xsize: 201.0 ysize: 101.0 xinc: 0.08 yinc: 0.07 xnpole: 0.0 ynpole: 0.0
Forecast data are modelled by a 30-km parallel version of the hydrostatic BOlogna Limited Area Model (BOLAM) operational at the National Agency for Environmental Protection and Technical Services (APAT) at Rome (Italy). This version, referred as 30-km QBOLAM model, is the driving model of the 11-km QBOLAM model which is described in the dphase_qbolam11 experiment. For DPHASE project, forecast data are provided over a subdomain (refered as DDOM) of the original domain (which covers the entire Mediterranean Basin). Not all the meteorological fields selected for the experiment are provided, since some of these are not produced by the QBOLAM model. Initial and boundary conditions for a 60-h QBOLAM33 forecast are derived from the European Centre for Medium-Range Weather Forecasts analysis and forecast issued at 1200 UTC on the previous day. Grid description: Please note that the westermost longitude and the southermost latitude points refer to the sub-domain chosen for MAP DPHASE. The QBOLAM original domain covers the Mediterranean Basin. DDOM: xfirst: -10.2 yfirst: 4.2 xsize: 54.0 ysize: 40.0 xinc: 0.3 yinc: 0.3 xnpole: -167.5 ynpole: 51.5
- preoperational model (planned to become operational in 2008) - configuration: Runge Kutta time integration scheme (dt=20sek); multi layer soil module; no parameterized deep convection; 60 levels; prognostic TKE, rain, snow and graupel - model runs are started at 00UTC 03UTC 09UTC 12UTc and 18UTC. Forecast range is 24h, except 09 and 18 run ranging upt to 30h. To complete the timeseries, dummy text files have been generated for 06UTC, 15UTC, 21UTC. Missing time steps are filled with dummy text files as well. Note: From 12th of July 2007 on, +24h forecasts are produced for 06, 15 and 21 UTC as well. Grid description: CDOM: xfirst: -2.76 yfirst: -0.02 xsize: 174.0 ysize: 141.0 xinc: 0.02 yinc: 0.02 xnpole: -170.0 ynpole: 43.0 DDOM: xfirst: -5.5 yfirst: -3.8 xsize: 500.0 ysize: 330.0 xinc: 0.02 yinc: 0.02 xnpole: -170.0 ynpole: 43.0
The horizontal grid spacing is here 8 km. The domain size is 160 x 108 gridpoints covering the MAP D-PHASE domain. The vertical grid has 50 levels up to 20 km with a grid length varying from 60 m close to the surface to 600 m at high altitude. The model was integrated forward for 30 hours every day starting from 00 UTC ECMWF analysis and keeping outputs every 1 hour. More information is available at http://mesonh.aero.obs-mip.fr/mesonh/cops/ Grid description: DDOM: xfirst: 2.0 yfirst: 43.0 xsize: 201.0 ysize: 88.0 xinc: 0.08 yinc: 0.08 xnpole: 0.0 ynpole: 0.0